Skip to content
WS Painting & Remodeling
Call

Flooring Installation in Dallas, GA

Dallas is the Paulding County seat, about twenty minutes from the shop, and its housing splits in two: an old core around the courthouse square and a wall of post-2000 subdivisions from the years Paulding was one of the fastest-growing counties in the country. That newer stock is the bulk of the work now, and it is the same builder-grade construction the crew already paints in Hiram and Powder Springs — just reaching its first repaint and first remodel a few years behind them.

Paulding County · about 20 minutes from our Powder Springs shop

Get a free estimate

Step 1 of 3

What do you need? * Pick all that apply

Free and no obligation. We never sell or share your details.

Flooring Installation for Dallas homes

Three layers. Around the courthouse square sit genuinely old wood-frame houses from the late 1800s through the 1920s — weatherboard siding, wood sash and deep trim that need carpentry and real prep, often over lead-era coatings, before any topcoat. Scattered between are 1960s-through-80s brick ranches and split-levels on larger lots. The bulk, though, is post-2000 neo-traditional subdivisions, and because the county grew so fast they are aging as one wave: builder-grade hardboard and Masonite lap siding, some early fiber-cement among it, is reaching the age where Georgia humidity ends it, the pressure-treated pine decks are spent, and the first kitchens and baths are due their remodel.

Areas we work in Dallas

  • Downtown Dallas
  • Brookside
  • Seven Hills
  • Allens Creek
  • Riverwood

Near Paulding County Courthouse, Dallas Theater, Sara Babb Park and across the rest of Dallas.

Flooring Installation on Dallas houses

Dallas sorts into three layers and the flooring job changes with each. Around the courthouse square the old wood-frame houses from the late 1800s into the 1920s often have original pine plank floors worth refinishing, and can carry pre-1978 sheet vinyl whose adhesive may contain asbestos and has to be tested before removal. The 1960s-through-80s brick ranches and split-levels on larger lots sometimes hide hardwood under the carpet and step between levels, so transitions matter. The bulk, though, is post-2000 neo-traditional subdivisions — Seven Hills, Allens Creek and the rest — built with builder carpet over a plywood subfloor that is now a straight replacement decision, aging across the county on one clock.

What usually gets missed

The miss on the square and the older ranches is covering original wood a refinish would have saved, and pulling up old sheet vinyl in a pre-1978 house without testing the adhesive first. On the split-levels it is the half-flight transitions between levels, where short stair runs hide rough stringers and short treads a flat-floor quote ignores. On the post-2000 subdivision stock it is the ordinary one — not flattening the subfloor, so swelled seams ridge through the new plank. Each is decided by what the crew finds under the existing floor, not by the sample in the showroom.

On a Dallas job we check

  • Check older square and ranch homes for hardwood worth refinishing
  • Test pre-1978 sheet vinyl and adhesive before removal
  • Flatten the plywood subfloor on the post-2000 subdivision stock

5.0 from 44 Google reviews. Dan James walks every finished job.

Get a free estimate

Step 1 of 3

What do you need? * Pick all that apply

Free and no obligation. We never sell or share your details.

(470) 419-0922

What the job actually involves

A floor is only as good as what it sits on. Most of a flooring job is the part you never see — checking the subfloor for flatness, moisture and movement, and fixing it — because that is what decides whether the finished floor stays flat, quiet and tight instead of cupping, gapping or squeaking in a year or two.

We install laminate, luxury vinyl plank, engineered and solid hardwood, and tile, matched to the room: vinyl or tile over slabs, basements and wet areas, hardwood in conditioned living space, with the underlayment and transitions the material calls for. We do not pair a good floor with the thinnest underlayment to shave the quote, because that is where noise and early wear come from.

How we run a flooring installation job in Dallas

  1. 1

    Pull back a corner and see what is really there

    Before anything is ordered we lift a corner of the existing carpet or flooring to see the subfloor, the height against the next room, and whether the house is on a slab or a crawlspace. What is under the floor, not the sample in the showroom, decides what can go down and what prep it needs.

  2. 2

    Test for moisture and check the subfloor

    Slabs and crawlspace subfloors are checked for moisture before any wood or vinyl is committed, because flooring laid over a wet base fails no matter how well it is installed. We also check the subfloor for flatness and for loose, soft or squeaking spots, and note the height difference into every adjoining room.

  3. 3

    Fix and flatten the subfloor

    High and low spots are ground down or filled with leveling compound, loose panels are refastened to the joists, and soft or water-damaged decking is cut out and replaced. On a crawlspace house a ground vapor barrier is part of keeping the new floor dry. This step is skipped on cheap jobs and is the reason they fail.

  4. 4

    Acclimate the material

    Wood and some vinyl are brought into the actual rooms and left to reach the home humidity before a board goes down. In a Georgia summer that matters: material installed straight off the truck swells or shrinks to the room later and opens gaps or buckles. We measure it rather than guess.

  5. 5

    Lay the floor and handle transitions

    The floor goes down by the method the material calls for — nail, glue, or floating click — with the right underlayment under it. Thresholds and transitions into tile, other rooms and stair nosings are cut so there is no trip edge, and doors are undercut so they still swing.

  6. 6

    Trim, clean and walk it

    Shoe molding or base is set to cover the expansion gap, seams and transitions are checked, and the floor is cleaned. We walk it with you in good light, looking for lifted edges, hollow spots and anything that catches, and work a punch list before it is closed out.

What moves the price

We will not quote Dallas blind over the phone — these are the things we look at on site that decide the number.

  • What is under the existing floor. Carpet over sound plywood pulls up easily; tile or glued vinyl, or a bad subfloor found underneath, adds removal and prep that a showroom quote never includes.
  • Material class. Laminate and vinyl plank sit at the low end, engineered hardwood and tile in the middle, and solid site-finished hardwood or natural stone at the top.
  • Subfloor repair and leveling. Grinding high spots, filling low ones, replacing soft decking, or adding a crawlspace vapor barrier is priced once the old floor is up.
  • Slab versus crawlspace. A slab limits solid hardwood and may need moisture control; a crawlspace can need subfloor and vapor work before new flooring goes down.
  • Square footage, and how cut-up the space is. Closets, angles, stairs and lots of doorways slow a job and add transitions and waste.
  • Stairs, patterns and transitions. Stair treads, diagonal or herringbone tile, and tying several finishes together at thresholds all add labor over a plain straight-lay field.
See typical flooring installation price ranges →

From a flooring installation customer

“This time it was a deck project as well as a full front door replacement. … Most importantly if there is something that is not to your liking, he will make it right. Not the norm in the contractor world.”
Grant Segal
Deck and front door replacement
All 44 reviews →

Want a real number for your Dallas flooring installation job?

The only way to price it honestly is to see it. We come out, walk the job and put it in writing — free, and with no obligation to book.

Call and we answer 24/7. Forms sent during the day get a call back the same day.

Flooring Installation in Dallas — questions we get asked

What is the most important part of a flooring job?
The subfloor. A floor fails from underneath — a lump telegraphs through vinyl, a low spot leaves a hollow that cracks tile grout, and a wet slab buckles wood. We spend real time flattening, drying and securing what is under the floor, because the finish only lasts if the base is right.
Should I replace my old hardwood or refinish it?
If the existing wood is solid and thick enough to sand, refinishing almost always costs less and lasts longer than covering it with new flooring. We check the boards before you spend money replacing something that only needs sanding and a new finish. Covering good hardwood with vinyl is usually the wrong call.
Can I put hardwood on a concrete slab?
Engineered hardwood can go over a slab once it passes a moisture test, because its layered construction handles the moisture concrete gives off. Solid hardwood cannot be fastened to concrete directly; it needs a wood subfloor or sleepers built over the slab first, which raises the floor and adds cost. On a slab, engineered or vinyl is usually the better call.
Which floor holds up best in Georgia humidity?
Vinyl plank and tile do not care about humidity and are the safe choice over slabs, in basements and in wet areas. Engineered hardwood is stable enough for most of the house. Solid hardwood is fine in conditioned rooms over a wood subfloor but moves the most with the seasons, so it needs the acclimation and gaps done right.
How long does new flooring take?
A single room is often a day or two. A main level is usually several days, more if the old floor fights coming up, the subfloor needs repair, or wood has to acclimate first. Tile adds time for mortar and grout to cure. We give you a schedule after we see what is under the existing floor.

Prefer to talk it through? Dan picks up.

(470) 419-0922
Call (470) 419-0922 Free Estimate