Skip to content
WS Painting & Remodeling
Call

Kitchen Remodeling in Douglasville, GA

Douglasville is the biggest market inside twenty minutes of the shop, and it is still growing west along the I-20 corridor. The local-pack incumbents here are unusually weak — the top-ranked painter in town has no website at all.

Douglas County · about 18 minutes from our Powder Springs shop

Get a free estimate

Step 1 of 3

What do you need? * Pick all that apply

Free and no obligation. We never sell or share your details.

Kitchen Remodeling for Douglasville homes

Large 1990s-2010s subdivisions on generous lots, plus older housing around the historic downtown. Volume exterior repaints and deck work dominate; the newer Chapel Hill stock is reaching its first serious repaint cycle.

Areas we work in Douglasville

  • Chapel Hill
  • Arbor Place
  • Bright Star
  • Fairplay
  • Dorsett Shoals

Near Arbor Place Mall, Hunter Memorial Park, Historic O’Neal Plaza and across the rest of Douglasville.

Kitchen Remodeling on Douglasville houses

Douglasville kitchens run larger than the west-Cobb average because the subdivisions out toward Chapel Hill and Bright Star were built on generous lots through the 1990s and 2010s, mostly with open-ish builder floor plans and nine-foot ceilings. Most are still on their original kitchen, so a remodel here is the first one — stripping out value-engineered builder stock rather than undoing someone else's work. The cabinets are framed builder boxes with worn-out hinges and glides, the island is usually big but short on outlets and overhang, and the layout already half-opens to the family room. The gain is less about moving walls and more about replacing everything that was built to a price the first time around.

What usually gets missed

The trap on a big builder kitchen is assuming bigger means simpler. These rooms were framed fast, so cabinet runs are rarely square, floors dip across a long span, and the island was often set over a slab with the plumbing and electric stubbed in one fixed spot. Move that island even a foot and you are chasing lines through concrete. We string-line the whole run for level before ordering cabinets, because a twelve-foot wall that is out by half an inch end to end turns a clean install into a day of shimming and scribing.

On a Douglasville job we check

  • Measure every long run for level before ordering — builder walls wander
  • Trace the island's plumbing and electric in the slab before moving it
  • Plan the outlets and overhang the original island never had

5.0 from 44 Google reviews. Dan James walks every finished job.

Get a free estimate

Step 1 of 3

What do you need? * Pick all that apply

Free and no obligation. We never sell or share your details.

(470) 419-0922

What the job actually involves

A kitchen remodel is several trades working in sequence in a small room. The order matters: demo, rough plumbing and electrical, inspections, cabinets, counters, backsplash, then finish work.

We use materials chosen for kitchens: moisture-resistant backing behind tile and sinks, solid cabinet boxes, and countertop materials that handle heat and stains, because kitchens take more abuse than any other room.

How we run a kitchen remodeling job in Douglasville

  1. 1

    Plan the layout and order materials

    Before demo we settle the layout, appliance sizes, cabinet orders and counter materials. Cabinets and special-order items can take weeks to arrive, so ordering early keeps the kitchen from sitting half-built.

  2. 2

    Demolition and protection

    Old cabinets, counters and flooring come out. Dust walls go up and floors elsewhere get covered. We check what is behind the walls and for water damage, old wiring or surprises.

  3. 3

    Rough-in plumbing, electrical and structure

    Any moved sinks, new circuits, venting or wall changes are done now, before drywall closes things back up. Permit work and required inspections happen at this stage where the work calls for them.

  4. 4

    Drywall, paint and flooring

    Walls are patched and finished, and floors go in. Painting happens before cabinets where it makes sense, which gives a cleaner result.

  5. 5

    Install cabinets, then template countertops

    Cabinets are set level and tied together. Counters are templated after cabinets are in, then fabricated, which commonly takes a week or more for stone, then installed.

  6. 6

    Backsplash, fixtures and finish

    Tile, plumbing fixtures, lighting, hardware and appliances go in last, followed by caulking, touch-up paint and a thorough cleanup. We walk through with you and work through a punch list.

What moves the price

We will not quote Douglasville blind over the phone — these are the things we look at on site that decide the number.

  • Scope: a cosmetic refresh versus moving walls, plumbing or the whole layout.
  • Cabinets: stock, semi-custom or custom, and how many.
  • Countertop material and square footage. Quartz, granite and laminate span a wide range.
  • Appliances and whether electrical or gas lines need to move.
  • Flooring, tile and lighting choices.
  • Hidden conditions such as rot, outdated wiring or uneven floors discovered during demo.
See typical kitchen remodeling price ranges →

From a kitchen remodeling customer

“The entire inside of my home was gutted and remodeled. … When the home would give us unexpected surprises, Dan would calm me down and give me several options. … The workmanship is impeccable!!”
Tonya W. Johnson
Whole-interior remodel, exterior trim
All 44 reviews →

Want a real number for your Douglasville kitchen remodeling job?

The only way to price it honestly is to see it. We come out, walk the job and put it in writing — free, and with no obligation to book.

Call and we answer 24/7. Forms sent during the day get a call back the same day.

Kitchen Remodeling in Douglasville — questions we get asked

How long does a kitchen remodel take?
Often several weeks to a couple of months, depending on scope and how long materials take to arrive. Lead time on cabinets and countertops is usually what stretches the schedule.
Can I live in the house during it?
Yes, though you will be without a normal kitchen for a good stretch. Many people set up a temporary spot with a microwave and a small fridge in another room. We keep dust contained and the rest of the house usable.
Do I need permits?
Many kitchen jobs involving electrical, plumbing or structural changes do. We tell you what applies in your county or city. Cosmetic updates may not need one.
What surprises show up most?
Water damage under old sinks and dishwashers, outdated wiring, and floors that are not level. We point these out when we find them, along with options.
Can you keep my existing cabinets?
Sometimes. If the boxes are sound and the layout works, refinishing or painting them can save money.

Prefer to talk it through? Dan picks up.

(470) 419-0922
Call (470) 419-0922 Free Estimate